Approved document B, Fire Safety, Volume 2, Buildings other than dwellinghouses (2019 edition), defines a protected circuit as:
| An electrical circuit that is protected against fire. |
Cabling should at least meet the requirements of PH 30 classification or an equivalent standard and should only pass through parts of the building in which fire risk is negligible.Protected circuits are required where it is critical that an electrical circuit continues to operate during a fire. This should include the use of sufficiently robust cables, careful selection of cable routes, and/or by the provision of physical protection in areas where cables may be susceptible to damage. Cable supports should generally be non-combustible and such that circuit integrity will not be reduced below that afforded by the cable.
Protected circuits should be separate from other circuits.
[edit] Related articles on Designing Buildings Wiki
- Amendment 3 BS 7671 Requirements for Electrical Installations IET Wiring Regulations.
- Approved document B.
- Approved document P.
- Approved documents.
- Articles by the Electrical Contractors' Association (ECA).
- Building regulations.
- Consumer unit.
- Electrical appliance.
- Electrical control systems.
- Electrical drawing.
- Electrical engineer.
- Fire.
- Glossary of electrical terms.
[edit] External references
- BS 5266-1.
- BS 5839-1.
- BS 7346-6.
- BS EN 50200:2006.
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Why construction can't afford to ignore the skills gap.
Building Safety Regulator, 19 August
Gill Kernick appointed Independent Chair of Residents’ Panel.
Connecting knowledge, technology and conservation
Building competence for the future of built heritage.
Building Regulations and Building Safety Act
CIOB publishes free advice for non-domestic clients.
Building Safety Newsletter from MHCLG.
An extraordinary record of steel engineering worldwide.
Households living near new pylons to save on bills.
ECA warns growth must not outpace grid capacity or skills.
The role of the client and decision making
CIOB response to built environment professions call for evidence.
Construction's sustainability reporting revolution
Tracking upfront embodied carbon with digital tools.
ECA welcomes procurement reforms
Public spending must back British jobs and skills.
Campaigning for Edinburgh: the Cockburn Association 1875-2049
The role of the civic voice in protecting character. Book review.